Recorded simulation · A2
Urgent oil result
Step by step
Key moment The urgent result, the order it asks for, and the alert resolving once the order is closed. The other steps are the background every story shares.
This step in detail
Scenario completed
An urgent oil result became an order, and was closed out
A laboratory result in one application became a work order in another, and closing that order resolved the original alert, with neither application reaching into the other.
- 5Applications involved
- 5Messages
- 1Correlation chains
- 0Unresolved exceptions
Checked against the reference flow
A2 — Urgent oil result to work — the alert asks Work for a draft order from the template; closing the order resolves it. The network's specification declares the messages this flow involves. Every one of them appears in this recording. It also contains messages outside the reference flow: work.create_work_order.
- ✓ condition.urgent_reading
- ✓ work.work_order_created
- ✓ work.work_closed
- ✓ condition.alert_resolved