Recorded simulation · A4
A service order from the plan
Step by step
Key moment The reading, the request for the order from the plan, and the closing that feeds back into the schedule. The other steps are the background every story shares.
This step in detail
Scenario completed
A meter reading became a planned service order
A reading recorded against an asset led Maintenance Schedule to ask Work for the service from the plan, and closing the order fed back into the schedule.
- 6Applications involved
- 4Messages
- 1Correlation chains
- 0Unresolved exceptions
Checked against the reference flow
A4 — A PM cycle with tiers — a meter reading brings the item due, one order covers the lesser services, closing it restarts the cycle. The network's specification declares the messages this flow involves. This recording covers part of that flow; the steps it does not exercise are shown unticked. It also contains messages outside the reference flow: work.create_work_order.
- ✓ lifecycle.usage_recorded
- ○ schedule.item_due
- ✓ work.work_order_created
- ✓ work.work_closed