Recorded simulation · A6
Job cost
Step by step
Key moment Stock used on the job, the work checked and closed, and the cost posted to the asset. The other steps are the background every story shares.
This step in detail
Scenario completed
A closed job was costed and posted to the asset
The cost of the stock and the hours booked to a job was carried from Inventory and Work to Finance, and posted to the asset, without anyone re-keying it.
- 6Applications involved
- 9Messages
- 1Correlation chains
- 0Unresolved exceptions
Checked against the reference flow
A6 — Job cost — parts issued from stock, the order closes with its cost, and Finance moves it from work in progress to the asset's cost centre. The network's specification declares the messages this flow involves. Every one of them appears in this recording. It also contains messages outside the reference flow: inventory.item_reserved, work.material_requirement_changed, work.material_requirement_created, work.work_order_created.
- ✓ inventory.item_issued
- ✓ work.work_verified
- ✓ work.work_closed
- ✓ finance.work_cost_posted