Recorded simulation · R1c
Delivery
Step by step
Key moment The goods arriving, being accepted, and the waiting reservation being filled. The other steps are the background every story shares.
This step in detail
Scenario completed
The delivery arrived and the held job resumed
The goods arrived, were accepted, and the job that was waiting for them could go ahead.
- 3Applications involved
- 6Messages
- 1Correlation chains
- 0Unresolved exceptions
Checked against the reference flow
R1c — Goods arrive and are accepted — the held reservation is filled and the work order can proceed. The network's specification declares the messages this flow involves. Every one of them appears in this recording. inventory.item_reserved arrived in a different order from the one the reference lists. It also contains messages outside the reference flow: work.record_job_cost.
- ✓ purchasing.shipment_dispatched
- ✓ inventory.goods_arrived
- ✓ inventory.receipt_accepted
- ✓ inventory.item_reserved
- ✓ work.material_requirement_changed