Recorded simulation · S1
Shutdown follows its work (S1)
Step by step
Key moment The scope freezing, the milestones being reached, and the work starting. The other steps are the background every story shares.
This step in detail
Scenario completed
A shutdown moved from scope to completion as its work orders did
The shutdown planner followed the work: readiness changed as a part was short and then arrived, the scope froze, the milestones were reached as the orders started and closed, and the campaign completed.
- 4Applications involved
- 44Messages
- 0Unresolved exceptions
Checked against the reference flow
S1 — A shutdown follows its work - orders are put in scope and assigned, readiness and progress arrive, the campaign completes. The network's specification declares the messages this flow involves. Every one of them appears in this recording. It also contains messages outside the reference flow: inventory.item_reserved, inventory.item_unavailable, inventory.receipt_accepted, purchasing.delivery_commitment_changed, purchasing.requirement_created, work.assign_campaign, work.material_requirement_changed, work.material_requirement_created, work.work_verified.
- ✓ campaign.readiness_changed
- ✓ work.readiness_changed
- ✓ campaign.scope_frozen
- ✓ work.work_started
- ✓ campaign.milestone_reached
- ✓ work.work_completed
- ✓ work.work_closed