DSLCore

Short part, fixed plant (A1)

A bearing is short for crusher work. Purchasing orders it, it arrives, is reserved and issued to the job, and its cost is posted to the books.

Recorded simulation replay — generated from an actual DSLCore network run (CORR-A1-124646). Pacing is normalised for viewing; the Technical view shows the recorded timings. Nothing on this page is live.

OrchestratorMobile plant workFixed plant workHaul road workShutdownsStockPurchasingFinanceOrchestratorMobile plant workFixed plant workHaul road workShutdownsStockPurchasingFinance

Step by step

Key moment The part not being in stock, Purchasing being asked to buy it, the goods arriving, and the cost reaching the books. The other steps are the background every story shares.

    This step in detail

    Checked against the reference flow

    A1 — A part is short for fixed plant work - purchasing orders it, it arrives, is reserved, issued and its cost posted. The network's specification declares the messages this flow involves. Every one of them appears in this recording. It also contains messages outside the reference flow: purchasing.delivery_delayed, work.material_requirement_changed, work.readiness_changed.

    1. ✓ work.material_requirement_created
    2. ✓ inventory.item_unavailable
    3. ✓ purchasing.requirement_created
    4. ✓ purchasing.order_placed
    5. ✓ purchasing.delivery_commitment_changed
    6. ✓ inventory.receipt_accepted
    7. ✓ inventory.item_reserved
    8. ✓ inventory.item_issued
    9. ✓ finance.document_posted