Haul road material in stock (A2)

Rock is needed to re-sheet a haul road segment. Stock has it, sets it aside, and issues it; the books post the cost; the work is completed and closed on a quantity check.

Recorded simulation replay — generated from an actual DSLCore network run (CORR-A2-124534). Pacing is normalised for viewing; the Technical view shows the recorded timings. Nothing on this page is live.

OrchestratorMobile plant workFixed plant workHaul road workShutdownsStockPurchasingFinanceOrchestratorMobile plant workFixed plant workHaul road workShutdownsStockFinance

Step by step

Key moment The material set aside from stock, the cost posted to the books, and the order closed. The other steps are the background every story shares.

    This step in detail

    Checked against the reference flow

    A2 — Haul road material is in stock - reserved at once, issued and its cost posted, the work completed and closed. The network's specification declares the messages this flow involves. Every one of them appears in this recording. It also contains messages outside the reference flow: work.material_requirement_changed, work.readiness_changed, work.work_verified.

    1. ✓ work.work_order_created
    2. ✓ work.material_requirement_created
    3. ✓ inventory.item_reserved
    4. ✓ inventory.item_issued
    5. ✓ finance.document_posted
    6. ✓ work.work_completed
    7. ✓ work.work_closed