Defect and wet-weather closure (H1)

A serious haul road defect becomes a work order at once. The segment is closed for wet weather and then reopened.

Recorded simulation replay — generated from an actual DSLCore network run (CORR-H1-124906). Pacing is normalised for viewing; the Technical view shows the recorded timings. Nothing on this page is live.

OrchestratorMobile plant workFixed plant workHaul road workShutdownsStockPurchasingFinanceOrchestratorHaul road work

Step by step

Key moment The defect, the segment being closed for wet weather, and its reopening. The other steps are the background every story shares.

    This step in detail

    Checked against the reference flow

    H1 — A serious defect is reported - a work order is made for it at once; the segment is closed for wet weather and reopened. The network's specification declares the messages this flow involves. Every one of them appears in this recording.

    1. ✓ work.defect_recorded
    2. ✓ work.work_order_created
    3. ✓ work.subject_closed
    4. ✓ work.subject_reopened