Grid Connection Assurance
Manage requirements, studies, agreements and obligations across the grid connection lifecycle.
- Grid connection
The operational need
This application connects connection requirements, technical studies, agreements, obligations, dependencies, risks and technical reviews through to connection approval — so that the grid connection lifecycle is coordinated, evidenced and auditable from application to energisation.
The application provides a developed operational starting point rather than a universal procedure. It demonstrates the core structure and workflow while leaving room for organisation-specific validation.
Typical tailoring
Organisation terminology, connection and study types, agreement and obligation structures, dependency and risk models, review and approval rules, workflow states, reporting, evidence requirements, integrations and existing data.
System boundaries
Where specialist systems already perform engineering, power-systems modelling, financial or analytical functions, they can remain in place. DSLCore is intended to hold the governed operational layer around them: workflow, decisions, approvals, actions, evidence and reporting.
This is a working demonstration. An implementation would be tailored and validated against your organisation's terminology, controls and systems.